filming update
We filmed the last of our performance part on the 6th of September 2014. We could only film the guitars because the drum kit had been removed. We decided on some creative and interesting shots such as camera mounted to neck of the guitar. We had issue with lighting because of the varied time we shot at and after reviewing footage decided that the lighting had to be changed due to the poor lighting in the footage we had captured.
We also had problems with the size of the SD card in the camera and also the battery life. The SD card only had enough space for 2 hours of footage and the camera only lasted about an hour. We solve the storage problem by moving the footage on to a portable hard drive and deleting the footage off the camera, we did this when the camera was charging. Just to be safe we made a backup of the footage on a 16GB memory stick as a loss of footage would have been very detrimental to our video.
No comments:
Post a Comment